US DOT 1691575 CA PUC MTR0191887 Insured and bonded Since 2007
888-678-6151

Los Angeles County

Southern California

Not on the list?

We dispatch from Simi Valley across Greater LA, the Inland Empire, Ventura County, and Orange County.

Confirm your coverage 888-678-6151
Warehouse Mezzanine Installation Los Angeles | Presto
Mezzanine installation

Mezzanine Floor Assembly and Permitting Support

Presto Logistics provides turnkey warehouse mezzanine floor assembly and permitting support for industrial facilities in Los Angeles, Simi Valley, and nationwide. We coordinate the design, engineering, and installation of structural steel mezzanines that effectively double your usable floor space without requiring relocation. Our team manages the entire project lifecycle, from the initial seismic engineering and high-pile storage permitting with the fire authority to the final bolt-up assembly and safety inspection. Whether you need a free-standing platform for inventory storage or a catwalk system for conveyor access, we deliver code-compliant vertical solutions that maximize your facility's cubic volume.

Request a feasibility study

No cost

Tell us your clear height, your slab thickness if you know it, and what you plan to store up there.

Permitting, engineering, and inspection handled. US DOT 1691575 · CA PUC MTR0191887

US DOT 1691575 CA PUC MTR0191887 Seismic Zone 4 engineered Edge protection OSHA compliant
Vertical cube

Expand Up, Not Out

If your warehouse has a 24-foot clear height but you are only using the floor, you are wasting half your rent.

Industrial work platforms transform air rights into tangible square footage. By installing a mezzanine, you can move administrative offices, kitting operations, or slow-moving SKU storage upstairs, freeing the ground floor for high-velocity shipping and receiving.

That lets you scale within your existing footprint rather than negotiating a new lease.

Point loading
125 PSF+Structural steel systems, rated at design stage against your commodity.
Column spacing
20 ft+Wide enough for unobstructed forklift traffic underneath.
Column point load
20,000 lb+Which is why the slab gets analysed before anything is bolted down.
Structural steel
Heavy I-beams and bar joists. Highest point-loading capacity and the widest column spacing, leaving the floor beneath genuinely usable.
Roll-formed C-channel
Lighter gauge components bolted together quickly. Cost-effective for archival storage and light assembly.
Permitting

Fire Code and High-Pile Storage Permitting

Los Angeles County has some of the strictest fire codes in the nation.

Fire department requirements

Installing a mezzanine changes the building area, which can affect your allowable fire flow. We handle the application process with the fire authority, submitting the high-pile storage plans to ensure the mezzanine does not obstruct smoke vents or exceed travel distance limits for emergency exits.

Sprinkler density and commodity classification

The most common point of failure in permitting is the fire sprinkler system. When you build a mezzanine, the roof sprinklers can no longer reach the floor below.

We work with fire protection engineers to calculate the required sprinkler density in gallons per minute per square foot, based on your commodity classification. The design then includes the necessary drop-down heads or in-rack sprinklers to meet Fire Marshal requirements.

The permit fails on sprinkler density more often than on steel. That is where the work goes first.

Seismic

Seismic Engineering for Multi-Level Platforms

In Simi Valley and Los Angeles, lateral stability is not optional.

Braced frames
X bracing between columns. Cheaper, but the bracing blocks access between those columns for the life of the platform.
Moment frames
Heavy-duty welded connections that resist rotation. No cross-bracing needed, so the space beneath stays fully open for forklift traffic.

Footing analysis and slab penetration

A mezzanine column creates a concentrated point load on your floor, often exceeding 20,000 lbs. Standard six-inch warehouse slabs may crack under that weight, so our engineers perform a footing analysis before anything is erected.

Where required, we saw-cut the slab, excavate, and pour reinforced concrete spread footings to support the new columns, so the structure never settles or sinks.

Safety

Mezzanine Safety and OSHA Compliance

Putting employees twelve feet in the air creates significant liability. Safety is not an accessory; it is engineered into the structure.

Egress staircases
OSHA-compliant tread depth and riser height, not a ladder bolted to a column.
Handrails
Continuous top rail with an intermediate rail beneath, so a fall cannot pass through the gap.
4-inch kickplates
Toeboards along the entire perimeter. A wrench, scanner, or box cannot be kicked off the edge onto someone working below.
Pivot safety gates
Also called guillotine gates. When the gate is open to the forklift the barrier shields the employee; when the employee reaches the load the barrier shields the drop-off.

There is never an open ledge. That is the whole point of the design.

Under the deck

Integrated Fire Suppression and Lighting

Building a mezzanine creates a dark cave underneath, and a sprinkler shadow with it.

Under-deck sprinkler head installation

A solid deck, whether plywood, B-deck, or concrete, blocks water from the ceiling sprinklers. We coordinate the installation of an under-deck sprinkler grid, extending the existing mains to run piping underneath the new platform so the ground floor remains protected.

For open bar grating decks, the existing overhead system can often serve both levels, provided the open-area percentage meets code.

LED lighting for the lower level

We integrate lighting into the build rather than treating it as a later problem, installing high-efficiency LED strip fixtures or troffers attached to the underside of the mezzanine steel.

Ground-level picking aisles stay in the 30 to 50 foot-candle range, which is what a forklift operator needs to work safely.

Upper deck

Modular In-Plant Offices and Vision Towers

Warehouse supervisors often need to be close to the action but protected from the noise.

Quiet zones above the factory floor

We install modular in-plant offices directly on top of your mezzanine. These pre-fabricated wall systems offer high sound transmission class ratings, creating a quiet, climate-controlled administrative space right above your shipping dock.

This vision tower approach improves management visibility while freeing up ground-level square footage for production. For acoustic treatment inside those rooms, see acoustic panel installation.

HVAC and electrical integration for upper levels

A mezzanine office is useless without power and air. We coordinate the installation of dedicated HVAC drop-downs and electrical sub-panels for the upper deck, integrated into your facility's existing grid and code-compliant, with data ports and LED lighting for a fully functional workspace.

Why us

Serving the Simi Valley and Los Angeles Industrial Basin

Transportation services since
2007
Vetted employees
30+

Mezzanine assembly involves crane lifts and high-torque bolting. It is not a job for general movers.

Our teams are trained in aerial lift safety and follow strict tie-off protocols when working at heights, and the structural steel erection, welding, sprinkler, electrical, and concrete elements are carried out by appropriately licensed trades.

From our headquarters at 3965 Heritage Oak Ct, we have worked in the tightest industrial parks of Chatsworth, Van Nuys, and Santa Clarita. We know the local inspectors and the region's specific seismic challenges, which is what shortens the path to a certificate of occupancy.

For racking that goes on the new deck, see racking installation. For machinery that has to move before the steel goes up, see industrial plant relocation.

Coverage

Industrial Facilities Across Greater Los Angeles and Nationwide

Warehouses, distribution centres, and manufacturing facilities.

Local work runs across the Valley, the Santa Clarita corridor, and the LA industrial basin, where seismic requirements and fire code are what they are and the inspectors are known quantities.

  • Simi Valley
  • Chatsworth
  • Van Nuys
  • Santa Clarita
  • Sun Valley
  • Vernon
  • City of Industry
  • Compton
  • Los Angeles
  • Riverside
  • Ontario
  • Nationwide
FAQ

Frequently Asked Questions About Mezzanine Construction

Something not covered? Call 888-678-6151 and we'll walk the building with you.

Do I need a permit to build a mezzanine in my warehouse?

Yes. In Los Angeles County and most municipalities, any structure over 5 feet 9 inches requires a building permit. If it exceeds 12 feet or specific area limits, it also requires a High-Pile Storage permit. We handle this entire process.

How much weight can a mezzanine hold?

It depends which system you build. Structural steel platforms carry the highest point loading, typically 125 PSF and above, with column spacing of 20 feet or more so forklifts can work underneath. Roll-formed C-channel systems are rated lower and suit archival storage or light assembly. The capacity is set at design stage against what you actually intend to store, so tell us the commodity before we specify.

Does the mezzanine need its own fire sprinklers?

If the deck is solid, yes. Plywood, B-deck, and concrete all block water from the ceiling sprinklers, so an under-deck grid is required to keep the ground floor protected, which means extending the existing mains beneath the new platform. Open bar grating is different: where the open-area percentage meets code, the existing overhead system can often cover both levels.

Next step

Send Us the Building and We'll Tell You What Fits

Leave us the details and let us make your moving stress-free with Presto Logistics.

Call 888-678-6151 or email info@prestomovers.net. Tell us your clear height, roughly what you plan to store upstairs, and whether you know the slab thickness. If you don't, that is one of the first things a feasibility study establishes.

Schedule a same-day callback

Pick a time

Or call 888-678-6151 directly. US DOT 1691575 · CA PUC MTR0191887

Running out of space? Don't move. Build up.

Scroll to Top